The Study of Efficiency affecting to Payment application. Case Study: MRT Blue Line Extension Project Contract 3, Taopun – Tha Pha Section
Keywords:
Efficiency, Site Inspection, MRT Blue Line Extension Project Contract 3 Taopun-Tha Phra SectionAbstract
The objective of this project is to studying efficiency which affect to payment application of MRT Blue Line Extension Project Contract 3, Taopun–Tha Pha Section by analyzing efficiency each payment and prevent guideline. This study uses questionnaire to collect the opinion data which affect totally 6 part such as 1.Man Power 2.Management 3.Money 4.Material 5.Machine 6.Method. The samplings are executive and operative totally 6 groups such as owner 4 people, consulting 4 people and contractor 16 people by dividing 4 part such as construction department, quantity surveyor department, quality assurance department and quality control department. The totally sampling are 24 people. The study shows that efficiency which affect to payment of project the first order is man power average 3.80, second order is management average 3.76, third order is material average 3.70, fourth order is method average 3.69, fifth order is money average 3.59 and the last order is machine average 2.69. This result can be guideline for developing the efficiency of payment application in the future project.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
บทความทั้งหมดที่ได้รับการคัดเลือกให้นำเสนอผลงานในการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 27 นี้ เป็นลิขสิทธิ์ของ วิศวกรรมสถานแห่งประเทศไทย ในพระบรมราชูปถัมภ์