Improving the construction process for laying water pipes and preplanning the construction with RSM to reduce complaints from the public
Keywords:
5-minute rating, construction productivity, Repetitive Scheduling MethodAbstract
Metropolitan Waterworks Authority produces Providing water distribution services to the public during the metering process and transporting water There is a large amount of water loss caused by leaking plumbing pipes as the main cause. Therefore, there is a policy to place new water pipes to replace in that area by placing new water pipes resulting in many complaints from people. This article aims to improve the construction process for laying water pipes, including planning the construction work in accordance with the improved construction process. to reduce complaints from the public and increase productivity in construction By starting to collect statistical data on complaints in the past 6 months from 1 May 2021 to 1 Nov 2021, analyze the causes and guidelines for risk management. to improve the process of laying water pipes A case study was the project to lay water pipes to reduce water loss in Soi Bang Krang 30, Nonthaburi Province. Use a method for collecting construction productivity data. with a 5-minute assessment method to improve construction productivity Analysis of construction statistics per day To plan the construction work using the Repetitive Construction Planning (RSM) method in accordance with the updated construction process.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
บทความทั้งหมดที่ได้รับการคัดเลือกให้นำเสนอผลงานในการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 27 นี้ เป็นลิขสิทธิ์ของ วิศวกรรมสถานแห่งประเทศไทย ในพระบรมราชูปถัมภ์