Lean Location-based Scheduling for High-Rise Building Project

Authors

  • - -
  • ผศ.ดร.ไพจิตร ผาวัน ภาควิชาวิศวกรรมโยธา วิศวกรรมศาสตร์ มหาวิทยาลัยศรีปทุม

Keywords:

Lean Location-based Scheduling, High-Rise Building, Time-Cost Optimization

Abstract

This paper presents a Lean Location-Base Scheduling for high-rise construction projects. The objective is to develop a work schedule format that is consistent with the job characteristics and working behavior of Thai construction workers. Based on the principle of analyzing critical activities together with the time-cost optimization. Under the allocation of labor groups to have the same working duration in each work group. Post-tension system of Condominium buildings were used in the study. The activities are divided into 20 activities, each sub-activity can be divided into work groups and labor groups according to the nature of repetitive construction. Setting the duration of work groups are 4 days, 5 days, 6 days, 7 days and 8 days per floor. It was found that the optimal duration and cost was 5 days per floor (Divide the activities into 5 workgroups, each work group takes 1 day). Direct cost are 114,844 baht and indirect cost are 138,250 baht, including total cost are 253,094 baht. Show that the Lean Location-Base Scheduling suitable for the construction of repetitive buildings.

Downloads

Download data is not yet available.

Published

2022-09-19

How to Cite

[1]
.-. - and ผาวัน ผ., “Lean Location-based Scheduling for High-Rise Building Project”, ncce27, vol. 27, pp. CEM40–1, Sep. 2022.

Issue

Section

Construction Engineering and Management

Most read articles by the same author(s)

<< < 8 9 10 11 12 13 14 15 > >>