Construction Management of Government Office Building Using Control Time Technique
Abstract
Construction management of government office building using control time techniques is necessary in order to result in construction management directed by objective the contractor and government. Therefore, executive project of government office building must to manage within very topic in control of the several problem and factor. The identification of the Problem and Factor Control (PFC) into the success project government office building on control time contract is very advantages to projects. The objective of this study was to analyze the problem and factor in construction management of government office building. (1) Collected questions 14 for Problem and Factor Control (PFC) from a literature review. (2) Data the Likert scale from deep interviews executive of government office building in Rayong province in Thailand 15 projects more than 10 million baht from firm listed on the department of business development in ministry of commerce in Thailand. (3) Analyze data deep interviews for found conclusion of the Problem and Factor Control (PFC) the construction management of government office building. From this study, it was found that there was one very important Problem and Factor Control (PFC), which was transportation to relatives of project x̄= 4.85. These problem and factors able to be applied construction management of government office building which in order to improve the construction management of contractor next project.
Downloads
Copyright (c) 2022 The Engineering Institute of Thailand Under H.M. The King's Pratonage
![Creative Commons License](http://i.creativecommons.org/l/by-nc-nd/4.0/88x31.png)
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
บทความทั้งหมดที่ได้รับการคัดเลือกให้นำเสนอผลงานในการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 27 นี้ เป็นลิขสิทธิ์ของ วิศวกรรมสถานแห่งประเทศไทย ในพระบรมราชูปถัมภ์