Performance Compare of Building Information Modeling with Fact Construction Projects : A Case Study of the Boost and Fitness Gym Project
Keywords:
Building Information Modeling , estimate the quantity, bidding constructionAbstract
Current bidding construction is highly competitive. Being Rushed by the bid price and the working duration. Fast and precision in the amount of quantity surveyor is required of all construction companies. This paper's main purpose. To evaluate the performance of Building Information Modeling (BIM) for apply or replace the quantity surveyor department. By a modeling process, building in 3D and the construction quantity caused in construction projects. The estimated cost of construction materials and the amounts shown in the accounts for Bill of Quantities (BOQ) used in the construction of competitive bidding. In analyzing the data set is divided into 3 parts, the first part quantity of Building Information Modeling (BIM). The second part quantity of the staff in the quantity surveying department. The third part quantity of the proceeds from collection of construction build. The findings will be presented the results of the Structural work. The results of the period to estimate the quantity and the number of personnel compared to estimate the quantity. Including present analysis results to interested companies to consider purchasing the software for building information technology model.
Downloads
References
ธนิต อภิวรกุลพัฒน์ (2560). "แบบจำลองเพื่อประเมินสมรรถนะสำหรับองค์กรซึ่งใช้การสร้างแบบจำลองสารสนเทศอาคาร" วิทยานิพนธ์ปริญญาวิศวกรรมศาสตรมหาบัณฑิต สาขาวิศวกรรมโยธา จุฬาลงกรณ์มหาวิทยาลัย.
Downloads
Published
How to Cite
Issue
Section
License
บทความทั้งหมดที่ได้รับการคัดเลือกให้นำเสนอผลงานในการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 25 นี้ เป็นลิขสิทธิ์ของ วิศวกรรมสถานแห่งประเทศไทย ในพระบรมราชูปถัมภ์