Factors Affecting Construction Delay in Blue Line Mass Transit System Project
Keywords:
Factors Affecting Construction Delay, Blue Line Mass Transit System ProjectAbstract
This research aims to study factors affecting construction delay in Blue Line Mass Transit System Project of Extension Project Contract 3 and present prevent guideline of construction delay. The study collected the sampling data by questionnaires from population who is target in this study such as people related with project construction 57 people and using Taro Yamane method for indicate the sample. Therefore there are the sampling 30 people. The study found that affect to delay in Blue Line Mass Transit System Project as follow this the first order is delay factor from construction method average 3.28, second order is delay factor from man power average 3.18, third order is delay factor from management average 3.06, fourth order is delay factor from regulations average 2.93, fifth order is delay factor from money average 2.80, sixth order is delay factor from machine average 2.78, seventh order is delay factor from material average 2.51. This study can be guideline for managing the construction to capability, preventing the delay problem and decreasing violent problem. The result shows the construction management will be successful follow by contract condition