The Study of Construction Problems and Obstacles at Rajamangala University of Technology Isan.
Keywords:
Delay Factor, Building Construction, Construction Problems and ObstacleAbstract
Problems and obstacles of building construction. Often, there is a delay of unfinished construction work. as a result, the economic disappearance. And to the people living in that area. Including those who take advantage of the building, the facility has suffered. Knowing the factors that cause problems. And good preparation from the information of experienced people. Can be prevented or reduce the impact that may cause. Construction problems The purpose of this research was to study the problems and obstacles of construction of Rajamangala University of Technology Isan. And to find solutions to problems and obstacles. In Rajamangala University of Technology Isan The data were collected from 3 representatives in the control group. Employee Inspectorate and construction contractors. The samples used in this research were the administrators, employees, or those who worked on the construction of buildings at Rajamangala University of Technology Isan. The instrument used to collect the data was a 5-level rating scale questionnaire. The research found that Factors that cause problems and obstacles in building construction. The top five most influenced by Rajamangala University of Technology Isan were the labor force, which was not enough for the workload, which had a high level of impact ( = 4.08). The impact was at a high level ( = 4.00). It is not easy to work with. At the very high level ( = 3.75), contractors began to work slowly. Delayed work The impact was at a high level ( = 3.58). Therefore, these factors should be carefully controlled to reduce the problems and obstacles in the construction work.