ปัญหาการควบคุมงานก่อสร้างประเภทงานอาคารขององค์กรปกครองส่วนท้องถิ่น
Abstract
The objective of this study is to study the problems that occurred in the process of construction supervision in structural work under construction management of Ban Bueng Municipality, Chonburi province. The results of this study can be applied to improve the work efficiency and reduce errors. The instruments used in this study is questionnaires collecting from current contractors or former contractors of Ban Bueng Municipality 51 persons. The questionnaire is divided into 2 parts. Part I is the general information of respondents and part II is the inquiring about the frequency and severity of the factors causing the problem in the process of construction supervision in structural work. The sets of tool used in the analysis of descriptive statistics are percentage, mean, standard deviation and severity index. From the analysis, it is found that the top 3 problems in the process of construction supervision in structural work are (i) insufficient worker for workload, (ii) defects of construction plan, respectively and (iii) problems arising from the employment of influential contractors.
Downloads
Copyright (c) 2021 The Engineering Institute of Thailand Under H.M. The King's Pratonage
![Creative Commons License](http://i.creativecommons.org/l/by-nc-nd/4.0/88x31.png)
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
บทความทั้งหมดที่ได้รับการคัดเลือกให้นำเสนอผลงานในการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 26 นี้ เป็นลิขสิทธิ์ของ วิศวกรรมสถานแห่งประเทศไทย ในพระบรมราชูปถัมภ์