การระบุปัจจัยความเสี่ยงของการควบคุมงานก่อสร้างในโครงการก่อสร้างอาคารที่พักผู้โดยสาร ท่าอากาศยานขอนแก่น
Keywords:
Risk factor, Risk identification, Terminal building, Airport construction projectAbstract
Risk of construction projects is likely to happen any time. The airport construction project is one of the complex and highly sophisticated construction projects. It also causes problems in the construction control in the project. The terminal building is one of the important elements in airports outside of the airside. But the result of delay in airport construction projects have associated negative impacts and effects. Thus, this research aims to identify and analysis the risk factors which affect the construction control in airport construction project using the Konkaen airport as the case study. The data was collected by the consultant group from all 10 personnel and the contractor group from all 10 personnel, who are assigned for airport construction project. The research methodologies consisted of interviews and questionnaires surveys. The main research methodology applied the key informant interview. After that, basic statistics was applied for risk level and its category. The results of this research found that there are twelve important risk categories, that is, 1) contractual risk 2) drawings and specifications risk 3) financial risk 4) scheduling risk 5) organization and human resource risk 6) skill and experience risk 7) material risk 8) physical resource risk 9) coordination between working parties 10) political risk 11) economic risk 12) environmental and social risk. Risk factors associated with scheduling risk is found to be the highly significant risk factors and political risk is found to be the lowest significant risk factors. These risk categories can be used for risk management planning. It is suitable for both groups of supervisors in the construction of the new passenger terminal building.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
บทความทั้งหมดที่ได้รับการคัดเลือกให้นำเสนอผลงานในการประชุมวิชาการวิศวกรรมโยธาแห่งชาติ ครั้งที่ 26 นี้ เป็นลิขสิทธิ์ของ วิศวกรรมสถานแห่งประเทศไทย ในพระบรมราชูปถัมภ์