Development of a Construction Process Model for Structural and MEP Works in Condominium Projects Using the COSMOS System
Keywords:
construction process model, condominium construction projects, simulation, COSMOS Simulator ProgramAbstract
This research focuses on the development of a construction process model for structural and MEP works in condominium buildings using the COSMOS Simulator Program for simulation. The model is based on real data from a condominium construction project. Since construction management does not follow a fixed pattern, processes vary even within the same organization. As a result, some projects fail to meet planned deadlines. This research presents a systematic approach to improving construction processes. The objective is to develop a model that identifies the shortest construction time to reduce duration and improve resource efficiency. The study found that the developed model can be applied effectively. It was also found that dividing the work area and allowing certain tasks to overlap significantly reduces construction time. Additionally, reducing labor in certain activities does not affect the overall duration and effectively lowers costs.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 วิศวกรรมสถานแห่งประเทศไทย

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
The selected article presented at the NCCE conference is the copyright of the Engineering Institute of Thailand under the Royal Patronage (EIT).