[1]
ยงญาติ พ. et al. 2022. An Economic Valuation Assessment in case of Changing the Toll Collection Structure from Flat-rate Toll Collection to Distance-Based Toll Collection. The 27th National Convention on Civil Engineering. 27, (Sep. 2022), TRL35–1.