กิมเฮียะ ชายรอง, and ไชยสกุลเกียรติ อุดมวิทย์. “Factors Affecting Construction Delay: A Case Study of the Metropolitan Rapid Transit Pink Line (Khae Rai - Min Buri)”. The 25th National Convention on Civil Engineering 25 (July 8, 2020): CEM14. Accessed October 31, 2024. https://conference.thaince.org/index.php/ncce25/article/view/286.