กิมเฮียะช. and ไชยสกุลเกียรติอ. 2020. Factors Affecting Construction Delay: A Case Study of the Metropolitan Rapid Transit Pink Line (Khae Rai - Min Buri). The 25th National Convention on Civil Engineering. 25, (Jul. 2020), CEM14.